We have reached the end of the third project work week and are making plans to move to NW Arkansas. This has been a wonderful experience as this is a very Spirit led congregation and they paid us a great compliment at the close of the prayer meeting last night, blessing us with their love. Here is a bit more of the work we were able to complete.
The rooms on the west side of the addition will contain a sink (you can see the drain of 2 sinks and the cold water line) and in the center of the picture is a stand pipe which leads several hundred feet underground to the maintenance shed.
This is a line to a new outside faucet.
This shows the drain lines for the water closets (stools) in the girls bathroom and wherever there is a drain there must be a water supply. That is what we supplied this week.
Since they are intending to have another pair of bathrooms with showers on the second floor, we had to snake a 2 inch water line up through all of the drain lines to supply water to the second floor.
This is a shot of the back side of the boys bathroom.
This is a shot of lighting panel one. When we arrived there was a blank box hanging on the wall. We installed the breakers and wiring.
Here is lighting panel two.
This is the main distribution panel. This, too, was a blank box. The wires coming into this panel are as big around as Billie's wrist. They were tough getting bent into place.
Since we are only 70 miles from the gulf, we plan to take a couple of days off and go to the beach. We will share pictures from there later.